::: Product Preview :::

::: Multi Gas Cylinder Installation :::

 

Multi Gas Cylinder Installation

Hi-Therm Gas Bank are designed to connect numbers of cylinder to one common delivery line. Depending upon the process, duty and stand by manifolds are used.  To ensure safe handling, the gas accessories are considered in the design.  Cylinders can be connected or taken out even when the systems is in use. 
Non return valves are provided for each individual cylinder so as to ensure gas from a cylinder
travels to process line instead balancing the pressure into coupled cylinders.  Apart it also ensure
safety in case of pigtail failure. Flame arrestor works as a safety device.  High pressure ISI marked flexible pigtails and click on adaptors forms the cylinder-manifold link. Primary and Secondary marked flexible pigtails and click on adaptors forms the cylinder-manifold link. Primary and Secondary Pressure Regulators are provided to set the operating pressure.  Necessary gauges are meant for indications. The Gas Bank And Its piping are installed as per Indian standard code IS 6044 Part A.

Typical Example Of 24 x 2 Gas Cylinder Manifold (Duty Cum Standby), Pressure Regulation System Installed At An
Aluminium Extrusion Plant, Ahmednagar

Multi Gas Cylinder Installation

   
Burner
Oil Burner
  Pressure Jet Low Air Pressure
Gas Burner
  Monoblock Fully automatic Gas Burner
  Natural Draft Burner
  Furnace Firegas Burner
Dual Fuel
Centrifugal Blowers
  Forced Draught Blowers
 Induced Draught Blowers
Fuel Oil Heating Pumping Filtering Unit

 Oil Heaters - Filters
Burner Control Systems
Sequence Controller &
    Flame Sensors
Oil Burner [Flame Eye]
Gas Burner [Fire Eye]
U V Controller
 Control Panels
 High / Low Flame Controller
Heating & Drying System
 Boilers
Coil Type Boiler Mini Gas Steam Boiler
Electric Steam Boiler
 Hot Air Generators
 Ovens
 Furnaces
Multi Gas Cylinder Installation
Designed & Hosted by : MID    Promoted by : GID